Skip to main content
Egypt Globe Group
Construction2 SKUsHS 2520.10FOB · CIF · CFR Per-lot CoA

Egyptian Gypsum — Raw Rock CaSO₄·2H₂O ≥ 85 % & Calcined Plaster

Egyptian gypsum for export: raw gypsum rock CaSO₄·2H₂O ≥ 85 % (cement retarder, agricultural) and calcined plaster of Paris ≥ 90 % hemihydrate. Sinai origin, HS 2520.10 / 2520.20, CoA per lot before B/L, bulk or FIBC FOB Damietta / Alexandria / Ain Sokhna.

2
SKUs in this sub-category
Certifications & standards
Applications served
100%
Lots CoA-verified before B/L
Catalogue

2 products ready for export

Quote any combination →

Egyptian gypsum — purity and combined water verified on every lot

Gypsum (calcium sulphate dihydrate, CaSO₄·2H₂O) occurs in Egypt as thick Miocene evaporite beds in Sinai and along the Red Sea and Gulf of Suez coasts, quarried by open-cast bench mining close to the Ain Sokhna and Damietta loading chains. Egypt Globe Group supplies two product lines from this resource: raw gypsum rock at ≥ 85 % CaSO₄·2H₂O for cement mills (set retarder), plasterboard feed and agricultural soil conditioning, and calcined gypsum plaster of Paris at ≥ 90 % hemihydrate for building plaster, moulds and casting.

For a cement mill, gypsum purity governs SO₃ dosing and therefore setting time of the finished cement; for a plasterboard line it governs slurry water demand and board strength. A lot that drifts from 88 % to 78 % dihydrate changes both. Many regional quarries ship on a single historical analysis. EGG's QA division samples every lot at the quarry face and again at the port, determines purity by combined-water and sulphate analysis (ASTM C471M / EN 13279-2), and releases the cargo on a Certificate of Analysis before the Bill of Lading. Lots below the contractual purity are rejected at the loading port.

Technical specification

Raw gypsum rock — physical properties

ParameterSpecificationTest methodStandard
Lump size — cement retarder grade0–50 mmEN 933-1 sieve analysisEN 13279-1 / ASTM C22
Lump size — plasterboard / calcining feed0–150 mmEN 933-1
Granule size — agricultural grade0–3 mmEN 933-1
Free moisture≤ 3.0 %ASTM C471MASTM C22 / C22M
Colour / appearanceWhite to light grey crystalline rockVisual
OriginEgypt, SinaiCertificate of Origin

Raw gypsum rock — chemical analysis

ParameterLimitTest methodQA sampling
CaSO₄·2H₂O purity≥ 85 % (cement retarder / plaster feed); ≥ 80 % agricultural gradeASTM C471M / EN 13279-2Every lot, quarry + port
Combined (crystal) water≥ 17.8 % at 85 % purity (pure dihydrate 20.9 %)Gravimetric, 45–230 °CEvery lot
SO₃≥ 39.5 %XRF / gravimetric BaSO₄Every lot
SiO₂ + acid insolubles≤ 5.0 %GravimetricEvery lot
Chloride (Cl⁻)≤ 0.10 %TitrationPer lot
MgO≤ 1.0 %XRFPer lot

Calcined gypsum plaster of Paris — physical & chemical properties

ParameterSpecificationTest methodStandard
Hemihydrate (CaSO₄·½H₂O) content≥ 90 %EN 13279-2 / ASTM C471MEN 13279-1
Combined water5–7 %GravimetricEN 13279-2
Fineness — residue on 150 µm sieve≤ 5 %EN 13279-2EN 13279-1
Initial setting time≥ 8 min (moulding) / ≥ 20 min (building plaster)Vicat, EN 13279-2EN 13279-1
Water / plaster ratio for standard consistency0.60–0.70EN 13279-2
AppearanceFine white powderVisual

Logistical & QA parameters

ParameterDetail
MOQ — containerised (FCL)200 MT plaster; 1,000 MT raw rock
MOQ — break-bulk vessel1,000 MT raw rock (contracts to 100,000 MT); plaster to 20,000 MT
PackingBulk vessel · 1 MT FIBC jumbo bags · 50 kg PP woven bags
Loading portsDamietta (EGDAM), Alexandria (EGALY), El Dekheila (EGEDK), Ain Sokhna (EGSOK)
IncotermsFOB (raw rock); FOB / CIF (plaster); CFR, DAP on request
Lead time2–4 weeks
Independent inspection protocolSGS / TÜV Austria / Intertek: increment sampling per ISO 3082-style bulk protocol, draft survey, witness purity and moisture test
Internal QA gatePer-lot CoA (purity, combined water, SO₃, moisture, sizing) issued by the port laboratory before B/L; out-of-spec lots rejected at the loading port
HS code2520.10 raw gypsum · 2520.20 plasters

QA verification chain

GateControlEvidenceWho · frequency
Quarry benchFace sampling, selective mining away from clay and anhydrite bandsBench analysis sheetEGG QA field team · per bench / per lot
Crushing, screening, calcinationSize fraction, moisture; kettle temperature and residence time for plasterProcess log, screen checkProducer QC under EGG supervision · per shift
Port laboratoryPurity by combined water and SO₃, moisture, sieve analysisCoA before B/LEGG port laboratory · every lot
Independent inspectionSampling, draft survey, witness test, sealed retained samplesSGS / TÜV Austria / Intertek certificateThird party · per vessel
Destination acceptanceBuyer mill laboratory re-test against CoABuyer report reconciled with CoABuyer · on arrival

Applications & markets

Standards & documentation

Request a quote

State grade (retarder, plasterboard feed, agricultural or calcined plaster), quantity, destination and Incoterm; a written offer with CoA format and lead time is returned within 24 hours. Request a quote or request a quote directly.

Other sub-categories in Construction

Browse related products across construction.

Need a tender match for egyptian gypsum — raw rock caso₄·2h₂o ≥ 85 % & calcined plaster?

Send the specification, tonnage and destination — a priced FOB / CIF / CFR offer with a sample Certificate of Analysis and inspection protocol comes back within 24 hours.

Request a Quote