Skip to main content
Egypt Globe Group
Ports

Damietta Port Code EGDAM — Egypt's Primary Bulk Export Hub

Damietta (EGDAM) — UN/LOCODE and port profile for Egypt's primary bulk export hub. 14.5 m berth, handysize + supramax, 4,000-7,000 MT/day. Salt, cement, fertilizer & grain. Transit GCC 2-3 d, EU 5-12 d, India 12-15 d.

01

Damietta Port — Egypt's primary bulk and salt loading hub, home of the EGG operations office

Damietta (port code / UN/LOCODE EGDAM) is Egypt's primary bulk export port — handling cement, salt, fertilizer, gypsum and general cargo from the Mediterranean industrial zones. With 17 m draft on the deepest berths and continuously modernising berth infrastructure, Damietta accommodates vessels from Handysize through Panamax / Kamsarmax, with selective partial-Capesize handling. Egypt Globe Group's New Damietta operations office — chartering desk, documentation coordination and the port QC laboratory — is on site, which is why Damietta is the default port for most EGG bulk cargo unless a different port is freight-shorter (Ain Sokhna for India / Far East, Al-Arish for Bardawil sea salt, Port Said East for ULCV / 22 m-draft requirements).

Damietta sits midway between Egypt's two salt source clusters: sea salt from North Sinai (Bardawil / El-Arish) ~250 km east via the coastal road, and rock salt from Siwa and Qattara via the Alexandria region ~500 km west. Cargo is consolidated at Damietta's covered and open bulk yards, verified by the port laboratory, then loaded via conveyor and ship-loader.

02

Port profile

ParameterDetail
UN/LOCODE (port code)EGDAM
LocationDamietta Governorate, Mediterranean coast, ~70 km east of Alexandria
TypeMulti-purpose deep-water — bulk, container, break-bulk, ro-ro
OperatorEgyptian Ports Authority + private terminal operators (including DCHC for containers)
StatusActive full-service, Egypt's primary bulk export hub
Max draft17 m (Kamsarmax + partial Capesize capable); 14.5 m at the main bulk berths
Typical vessel rangeHandysize → Handymax → Supramax → Panamax → Kamsarmax (partial Capesize on the deepest berths)
Bulk loading rate10,000–15,000 MT/day typical for salt and similar bulk; demonstrated up to 25,000+ MT/day on optimised cement and dry-bulk berths; 8,000 MT/day in the group port-loading register
Cement / clinker50,000 MT vessel loads regular; recent OPC 42.5 and clinker shipments for West African and Mediterranean buyers
Container terminalDCHC handles containers and general cargo; 700 boxes/day (register)
Berth type (register)Container specialised / bulk; dedicated salt bulk berth
Typical laytime / charges (register)3.0 days; USD 3.20 / MT
Milestones 2025–2026May 2026: MV YANG FAN bulk carrier with 144,780 MT of bulk slag — the largest bulk cargo handled at the port since establishment (289 m LOA × 45 m beam, 16 m draft); largest general-cargo shipment in port history (2025); continuous deepening and modernisation of channel, berths and marine services; cement and clinker terminals modernised for faster loading
03

Commodities loaded

CommoditySuitabilityNotes
Cement + clinkerExcellentEgypt's primary cement export port
Rock salt + sea saltExcellentAll grades, all vessel sizes; dedicated salt bulk berth
Gypsum + mineralsExcellentStrong bulk handling
FertilizerExcellentDedicated berths
General cargo / break-bulkExcellentMultipurpose berths
ContainerHighDCHC modern terminal

Typical lanes

Mediterranean Europe
(Italy, Spain, France, Greece, Türkiye): 3–7 day transit
Northern Europe
(Hamburg, Antwerp, Rotterdam): 10–14 days
West Africa
(Ghana, Nigeria, Côte d'Ivoire, Senegal, Cameroon): 8–14 days
East Africa via Suez
(Kenya, Tanzania, Mozambique): 10–15 days
Americas
(US East Coast, Brazil, Argentina): 16–22 days
South Asia via Suez
(India, Bangladesh, Sri Lanka): 18–25 days
04

Loading & QA protocol

GateControlEvidenceWho · frequency
Extraction / sourceNorth Sinai saltworks, Siwa / Qattara mine and cement-mill laboratories release each lot before trucking to DamiettaSource lab report, weighbridge ticketsEGG source laboratory · every lot
StockpileCovered and open bulk yards segregated by lot; pre-loading documentation lodged 24–48 h before berth allocationStockpile map, lot registerPort operations · continuous
Port laboratoryComposite sample per ISO / ASTM sampling plan; CoA / MTC issued before NOR acceptance and B/L; out-of-spec lot rejected, never re-graded or renegotiatedPer-lot CoA / MTCDamietta QC laboratory · every vessel
Independent inspectionHold inspection, sampling during loading, draft survey, witness test; surveyor and customs clearance run in parallel to loadingCertificate of Inspection, draft survey reportTÜV Austria / SGS / Intertek / Bureau Veritas · per shipment when contracted
Laycan & loadingNOR on arrival; SOF signed by Master, agent and EGG; loading rates per vessel class on the loading-rates page; Time Sheet basis for laytime, demurrage and despatchNOR, SOF, Time Sheet, Mate's ReceiptPort operations + agency · every vessel
DocumentsMate's Receipt + B/L; Certificate of Origin (preferential EUR.1 / PAFTA / AfCFTA where applicable); CoA / MTC; PSI certificate; Phytosanitary certificate (plant-origin cargo); GOEIC export clearanceFull document setDocumentation desk · every shipment
24-hour SLA

Ready for a quote?

FOB / CIF / CFR pricing from 7 Egyptian ports — turnaround within 24 hours.

Request Quote

More in Ports

Frequently asked questions

How do I request a quote?
Use the RFQ form at /rfq, or email [email protected] directly. We respond within 24 hours.
Where are your products sourced from?
Domestic Egyptian production wherever capacity exists — covering salt (Siwa, Qattara, North Sinai, Red Sea), cement, fertilizers, agro, minerals — plus curated re-export partnerships for commodities that aren't Egyptian-origin.

Other questions? Email our export desk — we respond within 24 hours.