Skip to main content
Egypt Globe Group
Ports

Damietta Port Code EGDAM

Damietta (EGDAM) — UN/LOCODE and port profile for Egypt's primary bulk export hub. 14.5 m berth, handysize + supramax, 4,000-7,000 MT/day. Salt, cement, fertilizer & grain. Transit GCC 2-3 d, EU 5-12 d, India 12-15 d.

01

Damietta Port — Egypt's primary bulk and salt loading hub, home of the EGG operations office

Damietta (port code / UN/LOCODE EGDAM) is Egypt's primary bulk export port — handling cement, salt, fertilizer, gypsum and general cargo from the Mediterranean industrial zones. With 17 m draft on the deepest berths and continuously modernising berth infrastructure, Damietta accommodates vessels from Handysize through Panamax / Kamsarmax, with selective partial-Capesize handling. Egypt Globe Group's New Damietta operations office — chartering desk, documentation coordination and the port QC laboratory — is on site, which is why Damietta is the default port for most EGG bulk cargo unless a different port is freight-shorter (Ain Sokhna for India / Far East, Al-Arish for Bardawil sea salt, Port Said East for ULCV / 22 m-draft requirements).

Damietta sits midway between Egypt's two salt source clusters: sea salt from North Sinai (Bardawil / El-Arish) ~250 km east via the coastal road, and rock salt from Siwa and Qattara via the Alexandria region ~500 km west. Cargo is consolidated at Damietta's covered and open bulk yards, verified by the port laboratory, then loaded via conveyor and ship-loader.

02

Port profile

UN/LOCODE (port code)
EGDAM
Location
Damietta Governorate, Mediterranean coast, ~70 km east of Alexandria
Type
Multi-purpose deep-water — bulk, container, break-bulk, ro-ro
Operator
Egyptian Ports Authority + private terminal operators (including DCHC for containers)
Status
Active full-service, Egypt's primary bulk export hub
Max draft
17 m (Kamsarmax + partial Capesize capable); 14.5 m at the main bulk berths
Typical vessel range
Handysize → Handymax → Supramax → Panamax → Kamsarmax (partial Capesize on the deepest berths)
Bulk loading rate
10,000–15,000 MT/day typical for salt and similar bulk; demonstrated up to 25,000+ MT/day on optimised cement and dry-bulk berths; 8,000 MT/day in the group port-loading register
Cement / clinker
50,000 MT vessel loads regular; recent OPC 42.5 and clinker shipments for West African and Mediterranean buyers
Container terminal
DCHC handles containers and general cargo; 700 boxes/day (register)
Berth type (register)
Container specialised / bulk; dedicated salt bulk berth
Typical laytime / charges (register)
3.0 days; USD 3.20 / MT
Milestones 2025–2026
May 2026: MV YANG FAN bulk carrier with 144,780 MT of bulk slag — the largest bulk cargo handled at the port since establishment (289 m LOA × 45 m beam, 16 m draft); largest general-cargo shipment in port history (2025); continuous deepening and modernisation of channel, berths and marine services; cement and clinker terminals modernised for faster loading
03

Commodities loaded

CommoditySuitabilityNotes
Cement + clinkerExcellentEgypt's primary cement export port
Rock salt + sea saltExcellentAll grades, all vessel sizes; dedicated salt bulk berth
Gypsum + mineralsExcellentStrong bulk handling
FertilizerExcellentDedicated berths
General cargo / break-bulkExcellentMultipurpose berths
ContainerHighDCHC modern terminal

Typical lanes

Mediterranean Europe
(Italy, Spain, France, Greece, Türkiye): 3–7 day transit
Northern Europe
(Hamburg, Antwerp, Rotterdam): 10–14 days
West Africa
(Ghana, Nigeria, Côte d'Ivoire, Senegal, Cameroon): 8–14 days
East Africa via Suez
(Kenya, Tanzania, Mozambique): 10–15 days
Americas
(US East Coast, Brazil, Argentina): 16–22 days
South Asia via Suez
(India, Bangladesh, Sri Lanka): 18–25 days
04

Loading & QA protocol

Verification chain6 gates · every consignment
  1. 1

    Extraction / source

    North Sinai saltworks, Siwa / Qattara mine and cement-mill laboratories release each lot before trucking to Damietta

    EvidenceSource lab report, weighbridge tickets

    EGG source laboratory · every lot

  2. 2

    Stockpile

    Covered and open bulk yards segregated by lot; pre-loading documentation lodged 24–48 h before berth allocation

    EvidenceStockpile map, lot register

    Port operations · continuous

  3. 3

    Port laboratory

    Composite sample per ISO / ASTM sampling plan; CoA / MTC issued before NOR acceptance and B/L; out-of-spec lot rejected, never re-graded or renegotiated

    EvidencePer-lot CoA / MTC

    Damietta QC laboratory · every vessel

  4. 4

    Independent inspection

    Hold inspection, sampling during loading, draft survey, witness test; surveyor and customs clearance run in parallel to loading

    EvidenceCertificate of Inspection, draft survey report

    TÜV Austria / SGS / Intertek / Bureau Veritas · per shipment when contracted

  5. 5

    Laycan & loading

    NOR on arrival; SOF signed by Master, agent and EGG; loading rates per vessel class on the loading-rates page; Time Sheet basis for laytime, demurrage and despatch

    EvidenceNOR, SOF, Time Sheet, Mate's Receipt

    Port operations + agency · every vessel

  6. 6

    Documents

    Mate's Receipt + B/L; Certificate of Origin (preferential EUR.1 / PAFTA / AfCFTA where applicable); CoA / MTC; PSI certificate; Phytosanitary certificate (plant-origin cargo); GOEIC export clearance

    EvidenceFull document set

    Documentation desk · every shipment

Priced offers

Ready for a quote?

FOB / CIF / CFR pricing from 7 Egyptian ports — turnaround once stock, laycan and freight are confirmed.

Request Quote

More in Ports

Frequently asked questions

What is the port code for Damietta Port, and which vessels can it take?
UN/LOCODE EGDAM, maximum draft 17 m (Kamsarmax + partial Capesize capable); 14.5 m at the main bulk berths, typical vessel range Handysize → Handymax → Supramax → Panamax → Kamsarmax (partial Capesize on the deepest berths), multi-purpose deep-water — bulk, container, break-bulk, ro-ro.
What cargo can be loaded at Damietta Port?
Best suited for Cement + clinker, Rock salt + sea salt, Gypsum + minerals, Fertilizer, General cargo / break-bulk, Container.
What loading rate and laytime terms apply at Damietta Port?
Bulk loading rate: 10,000–15,000 MT/day typical for salt and similar bulk; demonstrated up to 25,000+ MT/day on optimised cement and dry-bulk berths; 8,000 MT/day in the group port-loading register. NOR on arrival; SOF signed by Master, agent and EGG; loading rates per vessel class on the loading-rates page; Time Sheet basis for laytime, demurrage and despatch.
What testing happens at Damietta Port before loading?
Composite sample per ISO / ASTM sampling plan; CoA / MTC issued before NOR acceptance and B/L; out-of-spec lot rejected, never re-graded or renegotiated. Independent inspection: Hold inspection, sampling during loading, draft survey, witness test; surveyor and customs clearance run in parallel to loading.
Which documents are issued for a shipment from Damietta Port?
Mate's Receipt + B/L; Certificate of Origin (preferential EUR.1 / PAFTA / AfCFTA where applicable); CoA / MTC; PSI certificate; Phytosanitary certificate (plant-origin cargo); GOEIC export clearance.

Other questions? Email our export desk — the export desk replies to every request.