Skip to main content
Egypt Globe Group
Ports

Safaga Port Code EGSGA

Safaga (EGSGA) — UN/LOCODE and port profile for Egypt's Red Sea phosphate & dry-bulk hub. Noatum Safaga Terminal expansion H2 2026: 450k TEU + 5M MT dry bulk + 50k CEU ro-ro. Abu Tartour mining port.

01

Safaga Port — Red Sea phosphate and dry-bulk hub, multi-purpose expansion live H2 2026

Safaga (port code / UN/LOCODE EGSGA) is Egypt's Red Sea mid-coast port, historically Egypt's primary phosphate export hub (via the Abu Tartour mining concession). As of 2026 the port is undergoing major expansion under the Noatum Ports Safaga Terminal project (AD Ports Group / Noatum subsidiary), which secured ~USD 115 million in financing in February 2026 to bring a new multi-purpose terminal online in H2 2026. Egypt Globe Group uses Safaga for phosphate rock, bulk minerals, cement and chemical-grade salt bound for the Indian Ocean and Far East, with a port-side QC team applying the group's per-lot Certificate of Analysis gate before the Bill of Lading.

Safaga is one of the group's 7 Egyptian loading ports; salt cargo here carries long inland trucking from North Sinai or Siwa, so it is booked where the destination lane or a combined mineral cargo makes the routing freight-optimal.

02

Port profile

UN/LOCODE (port code)
EGSGA
Location
Red Sea Governorate, Red Sea (mid-coast), ~470 km south of Suez
Type
Multi-purpose bulk + container (post-2026 expansion), phosphate specialty
Operator
Egyptian Ports Authority + Noatum Ports (AD Ports Group)
Status
Active phosphate hub; multi-purpose expansion live H2 2026
Draft
~10–16 m depending on berth (channel depths typically 16–18 m)
Typical vessel range
Handysize → Handymax / Supramax
Bulk capacity (post-expansion)
5 million MT dry bulk + 1 million MT liquid bulk per year
Container capacity (post-expansion)
450,000 TEU/year
Ro-ro (post-expansion)
50,000 CEU/year
New terminal scale
810,000 m² total area; 1,000 m quay wall
Specialty
Abu Tartour mining port for rock-phosphate loading
Milestones 2026
Feb 2026: AD Ports Group / Noatum secures ~USD 115M financing; H2 2026: Noatum Ports Safaga Terminal goes live
03

Commodities loaded

CommoditySuitabilityNotes
Phosphate rockExcellentPrimary Egyptian phosphate-export hub; India, Bangladesh, Indonesia, Vietnam
Bulk minerals + gypsum (gypsum, limestone, dolomite, silica sand)HighStrong bulk handling; Indian Ocean + Far East
CementHighActive export commodity; East African and Yemeni reconstruction
Bulk salt (chemical grade)MediumEmerging route; long inland trucking from North Sinai / Siwa
Container general (post-2026)High450k TEU/year; broader Red Sea / Indian Ocean rotations
Ro-roHighPost-expansion 50k CEU/year
04

Loading & QA protocol

Verification chain6 gates · every consignment
  1. 1

    Extraction / source

    Mine, quarry or mill laboratory releases each lot (P₂O₅ and moisture for phosphate; NaCl, insolubles and moisture for salt; EN 197-1 / ASTM C150 parameters for cement)

    EvidenceSource lab report

    EGG source laboratory / mine lab · every lot

  2. 2

    Stockpile

    Port stockpile segregated by lot; covered storage for hygroscopic cargo

    EvidenceStockpile map, lot register

    Port operations · continuous

  3. 3

    Port laboratory

    Composite sample per ISO / ASTM sampling plan; CoA / MTC issued before NOR acceptance and B/L; out-of-spec lot rejected, never re-graded

    EvidencePer-lot CoA / MTC

    Safaga QC team · every vessel

  4. 4

    Independent inspection

    Hold inspection, sampling during loading, draft survey, witness test; BIS / GACC / BSTI programmes where required

    EvidenceCertificate of Inspection, draft survey report

    TÜV Austria / SGS / Intertek / Bureau Veritas · per shipment when contracted

  5. 5

    Laycan & loading

    NOR on arrival; SOF signed by Master, agent and EGG; Handysize–Supramax berths; Time Sheet basis for laytime

    EvidenceNOR, SOF, Time Sheet, Mate's Receipt

    Port operations + agency · every vessel

  6. 6

    Documents

    Mate's Receipt + B/L; Certificate of Origin; CoA / MTC; PSI certificate; GOEIC export clearance

    EvidenceFull document set

    Documentation desk · every shipment

Priced offers

Ready for a quote?

FOB / CIF / CFR pricing from 7 Egyptian ports — turnaround once stock, laycan and freight are confirmed.

Request Quote

More in Ports

Frequently asked questions

What is the port code for Safaga Port, and which vessels can it take?
UN/LOCODE EGSGA, maximum draft ~10–16 m depending on berth (channel depths typically 16–18 m), typical vessel range Handysize → Handymax / Supramax, multi-purpose bulk + container (post-2026 expansion), phosphate specialty.
Which commodities does Egypt Globe Group load at Safaga Port?
Best suited for Phosphate rock, Bulk minerals + gypsum (gypsum, limestone, dolomite, silica sand), Cement, Container general (post-2026), Ro-ro.
What laycan and loading terms apply at Safaga Port?
NOR on arrival; SOF signed by Master, agent and EGG; Handysize–Supramax berths; Time Sheet basis for laytime.
How does Egypt Globe Group check quality at Safaga Port?
Composite sample per ISO / ASTM sampling plan; CoA / MTC issued before NOR acceptance and B/L; out-of-spec lot rejected, never re-graded. Independent inspection: Hold inspection, sampling during loading, draft survey, witness test; BIS / GACC / BSTI programmes where required.
What paperwork ships with cargo from Safaga Port?
Mate's Receipt + B/L; Certificate of Origin; CoA / MTC; PSI certificate; GOEIC export clearance.

Other questions? Email our export desk — the export desk replies to every request.