Skip to main content
Egypt Globe Group
Ports

Alexandria Port Code EGALY

Alexandria (EGALY) — UN/LOCODE and port profile for Egypt's main Mediterranean gateway. 14 m berth, handysize + supramax, refinery-served chemical berth. FOB bulk salt, minerals, fertilizer & general cargo.

01

Alexandria Port — Mediterranean salt and bulk loading under the group's port QC gate

Alexandria (port code / UN/LOCODE EGALY) is Egypt's historic commercial port and largest Mediterranean-side multi-purpose hub for cement, salt, fertilizer and general bulk cargo. With ~14 m draft at primary berths and full-service infrastructure, Alexandria serves vessels from Handysize through Panamax with selective Kamsarmax handling. Egypt Globe Group consolidates Siwa Oasis and Qattara Depression rock salt — guaranteed ≥ 97.00 % NaCl — in the Alexandria region and loads sub-Panamax rock-salt cargoes, cement, fertilizer, gypsum and containers here with a port-side QC team on site.

Alexandria handles sub-Panamax rock-salt cargoes, cement export shipments, fertilizer, gypsum and container cargo. For the largest rock-salt vessels (Panamax+) the deeper-draft adjacent El Dekheila (17–20 m) is preferred. For Bardawil sea salt, Al-Arish (14 m, upgraded 2026) is closer to source. For ULCV / 22 m-draft requirements use Port Said East.

02

Port profile

UN/LOCODE (port code)
EGALY
Location
Alexandria Governorate, Mediterranean coast
Type
Multi-purpose commercial port — bulk, container, break-bulk, ro-ro
Operator
Alexandria Port Authority + private terminal operators (including Alexandria Container Terminal)
Status
Active full-service, established Mediterranean line rotations
Max draft
~14 m at primary berths
Typical vessel range
Handysize 10,000 DWT → Panamax 65,000 DWT (selective Kamsarmax)
Bulk loading rate
6,000–10,000 MT/day depending on berth and commodity; 8,000 MT/day in the group port-loading register
Container terminal
Alexandria Container Terminal (ACT); 500 boxes/day (register)
Storage
Covered + open bulk yards, multiple cement silos
Typical laytime / charges (register)
3.5 days; USD 4.00 / MT; congestion possible May–Sep; pilotage mandatory
Port siblings
El Dekheila (EGEDK) 7 km west, 17–20 m draft; priced as one POL with Alexandria
03

Commodities loaded

CommoditySuitabilityNotes
Egyptian rock salt (Siwa + Qattara)HighStrong; El Dekheila preferred for the largest vessels
Egyptian sea saltHighGood when Bardawil-source inland trucking is acceptable
Cement + clinkerExcellentMajor export commodity, dedicated berths
GypsumHighGood bulk handling
FertilizersExcellentAbu Qir + AlexFert plants direct-loaded
Marble + dimension stoneHighEstablished lane
ContainerHighACT modern terminal

Typical lanes

Mediterranean Europe
Italy, Spain, France, Greece, Türkiye, Cyprus, Lebanon, Israel — 3–7 days
Northern Europe
Hamburg, Bremerhaven, Antwerp, Rotterdam — 12–15 days
West Africa
Ghana, Nigeria, Côte d'Ivoire, Senegal — 8–14 days
East Africa via Suez
Kenya, Tanzania, Mozambique — 10–15 days
US East Coast
NY/NJ, Houston via Atlantic — 18–22 days
South America
Brazil (Santos, Paranaguá) — 16–21 days
04

Loading & QA protocol

Verification chain6 gates · every consignment
  1. 1

    Extraction / source

    Siwa / Qattara mine laboratories (on site) release each rock-salt lot; cement mills and fertilizer plants issue mill certificates before dispatch

    EvidenceSource lab report, mill certificate

    EGG source laboratory · every lot

  2. 2

    Stockpile

    Consolidation stockpile and cement silos segregated by lot

    EvidenceStockpile map, lot register

    Port operations · continuous

  3. 3

    Port laboratory

    Composite sample per ISO / ASTM sampling plan; CoA / MTC issued before NOR acceptance and B/L; out-of-spec lot rejected, never re-graded

    EvidencePer-lot CoA / MTC

    Alexandria QC team · every vessel

  4. 4

    Independent inspection

    Hold inspection, sampling during loading, draft survey, witness test; container fumigation certificate for FCL

    EvidenceCertificate of Inspection, fumigation certificate

    TÜV Austria / SGS / Intertek / Bureau Veritas · per shipment when contracted

  5. 5

    Laycan & loading

    NOR on arrival; SOF signed by Master, agent and EGG; 6,000–10,000 MT/day by berth; Time Sheet basis for laytime

    EvidenceNOR, SOF, Time Sheet, Mate's Receipt

    Port operations + agency · every vessel

  6. 6

    Documents

    Mate's Receipt + B/L; Certificate of Origin (preferential EUR.1 / PAFTA / AfCFTA); CoA / MTC; PSI certificate; GOEIC export clearance

    EvidenceFull document set

    Documentation desk · every shipment

07

Request a quote

State the tonnage and target vessel class; the chartering desk nominates Alexandria main or El Dekheila according to draft and confirms laycan terms.

Breakbulk freight forwarding to Alexandria port and El Dekheila, for bagged, FIBC and palletised parcels stowed as part-cargo, is covered on the logistics and freight forwarding page; shore handling on port services and stevedoring.

Request a quote with Alexandria FOB →
El Dekheila deep-water comparison →
Damietta comparison →
All 7 Egyptian loading ports →

Priced offers

Ready for a quote?

FOB / CIF / CFR pricing from 7 Egyptian ports — turnaround once stock, laycan and freight are confirmed.

Request Quote

More in Ports

Frequently asked questions

What is the UN/LOCODE and vessel capacity at Alexandria Port?
UN/LOCODE EGALY, maximum draft ~14 m at primary berths, typical vessel range Handysize 10,000 DWT → Panamax 65,000 DWT (selective Kamsarmax), multi-purpose commercial port — bulk, container, break-bulk, ro-ro.
What cargo can be loaded at Alexandria Port?
Best suited for Egyptian rock salt (Siwa + Qattara), Egyptian sea salt, Cement + clinker, Gypsum, Fertilizers, Marble + dimension stone and 1 more.
What laycan and loading terms apply at Alexandria Port?
Bulk loading rate: 6,000–10,000 MT/day depending on berth and commodity; 8,000 MT/day in the group port-loading register. NOR on arrival; SOF signed by Master, agent and EGG; 6,000–10,000 MT/day by berth; Time Sheet basis for laytime.
How is cargo verified at Alexandria Port before the Bill of Lading?
Composite sample per ISO / ASTM sampling plan; CoA / MTC issued before NOR acceptance and B/L; out-of-spec lot rejected, never re-graded. Independent inspection: Hold inspection, sampling during loading, draft survey, witness test; container fumigation certificate for FCL.
Which export documents come from Alexandria Port?
Mate's Receipt + B/L; Certificate of Origin (preferential EUR.1 / PAFTA / AfCFTA); CoA / MTC; PSI certificate; GOEIC export clearance.

Other questions? Email our export desk — the export desk replies to every request.