Skip to main content
Egypt Globe Group
Ports

Ain Sokhna Port Code EGSOK

Ain Sokhna (EGSOK) — UN/LOCODE and port profile on Egypt's Red Sea coast. Container + breakbulk, 1M+ TEU 2025 record. Shortest transit to GCC (Saudi Arabia, UAE, Kuwait). FOB bulk salt, cement & minerals.

01

Ain Sokhna Port — Red Sea loading gateway, record 2025 throughput, EGG port laboratory on site

Ain Sokhna (port code / UN/LOCODE EGSOK) is Egypt's primary Red Sea commercial port, 60 km south of the Suez Canal entrance. Managed by DP World Sokhna, it provides the shortest sea route from Egypt to East Africa, GCC, India, Pakistan, China and the Far East. In 2025 DP World Sokhna handled a record 1 million TEU — its highest annual volume. Egypt Globe Group's Red Sea saltworks are at Ain Sokhna and the group's port-side QC team operates at the port, so Red Sea sea salt, Siwa / Qattara rock salt, cement, fertilizer and phosphate are sampled, released and loaded under one Quality Assurance protocol.

For any cargo bound for destinations east and south of the Suez Canal, Ain Sokhna is the freight-optimal Egyptian loading point: southbound traffic bypasses the canal, saving transit time and canal fees versus Mediterranean loading.

02

Port profile

UN/LOCODE (port code)
EGSOK
Location
Suez Governorate, Red Sea (Gulf of Suez), 60 km south of the Suez Canal entrance
Type
Multi-purpose deep-water — container, bulk, ro-ro, oil + LNG
Operator
DP World Sokhna (container + bulk terminals), private operators (specialty berths)
Status
Modern and automated, growing capacity, Suez Economic Zone industrial backing
Basin depth
17 m with 680 m basin width and direct Gulf of Suez access
Tanker single-buoy moorings
1 buoy up to 500,000 DWT (no draft limit); 1 buoy up to 150,000 DWT (16.5 m max draft); 2 buoys up to 350,000 DWT (22.9 m max draft)
Typical commercial vessel range
Handysize → Capesize → ULCV
Bulk loading rate
10,000–15,000 MT/day on dedicated bulk berths; 12,000 MT/day in the group port-loading register
Dry-bulk berths
3 dedicated dry-bulk berths, 20 million MT/year capacity
Container
3-basin layout, 1.75M TEU total annual capacity; 2025 record 1.0M TEU; SCCT-adjacent terminal among the deepest in MENA; 800 boxes/day (register)
Typical laytime / charges (register)
2.5 days; USD 3.00 / MT
Milestones 2025–2026
Record 1.0M TEU (DP World Sokhna); continuous expansion under the SCZONE master plan
03

Commodities loaded

CommoditySuitabilityNotes
Salt (Siwa / Qattara rock salt + chemical-grade)ExcellentStrong infrastructure, 17 m draft; GCC chlor-alkali and Indian chemicals
Red Sea sea salt (Ain Sokhna saltworks)ExcellentSaltworks on the same coast — minimal inland trucking
Cement + clinkerExcellentEast Africa, Yemen, Sudan, Djibouti, Indian subcontinent rotation hub
Fertilizers (urea, DAP)ExcellentDedicated bulk berths, 20M MT/year; East Africa, India, Pakistan, Bangladesh
Gypsum + plaster, mineralsExcellentGood bulk handling; GCC drywall, Indian cement
Phosphate rockExcellentIndia, China, Bangladesh, Indonesia
Edible oils + agroGoodEast Africa, Gulf
Container generalExcellentDP World, deepest container terminal in MENA; full range to the Indian Ocean and Far East
Petroleum, LPG, LNGExcellentUp to 500,000 DWT tanker berths
Sea salt (North Sinai / Bardawil source)LimitedLong inland trucking — consider Al-Arish or Damietta

Transit advantage (Suez bypass for southbound cargo)

Direct East Africa
Mombasa, Dar es Salaam, Djibouti, Berbera — 4–7 day transit
Direct Gulf
Jeddah, Aqaba, Jubail, Dubai, Bahrain — 3–6 days
Direct India
Mundra, JNPT, Tuticorin — 10–14 days
Direct China
Shanghai, Shenzhen via Suez-bypass routing — 28–32 days (vs ~35 days Mediterranean)
Direct Far East
Singapore, Port Klang — 18–22 days
04

Loading & QA protocol

Verification chain6 gates · every consignment
  1. 1

    Extraction / source

    Red Sea saltworks laboratory (on site), Siwa / Qattara mine laboratories, cement mills and mines release each lot before it moves to the port

    EvidenceSource lab report

    EGG source laboratory · every lot

  2. 2

    Stockpile

    Segregated stockpile in the bulk yard; covered storage for hygroscopic cargo

    EvidenceStockpile map, lot register

    Port operations · continuous

  3. 3

    Port laboratory

    Composite sample per ISO / ASTM sampling plan; CoA / MTC issued before NOR acceptance and B/L; out-of-spec lot rejected, never re-graded or renegotiated

    EvidencePer-lot CoA / MTC

    Ain Sokhna QC team · every vessel

  4. 4

    Independent inspection

    Hold inspection, sampling during loading, draft survey, witness test; SABER, KEBS PVoC, BIS, GACC programmes where required

    EvidenceCertificate of Inspection, draft survey report

    TÜV Austria / SGS / Intertek / Bureau Veritas · per shipment when contracted

  5. 5

    Laycan & loading

    NOR on arrival; SOF signed by Master, agent and EGG; 10,000–15,000 MT/day on dedicated bulk berths; Time Sheet basis for laytime

    EvidenceNOR, SOF, Time Sheet, Mate's Receipt

    Port operations + agency · every vessel

  6. 6

    Documents

    Mate's Receipt + B/L; Certificate of Origin (PAFTA preferential for Arab destinations, EUR.1 for EU rotations); CoA / MTC; PSI certificate; Red Sea-specific maritime safety documentation; GOEIC clearance

    EvidenceFull document set

    Documentation desk · every shipment

Priced offers

Ready for a quote?

FOB / CIF / CFR pricing from 7 Egyptian ports — turnaround once stock, laycan and freight are confirmed.

Request Quote

More in Ports

Frequently asked questions

What is the UN/LOCODE and vessel capacity at Ain Sokhna Port?
UN/LOCODE EGSOK, maximum draft 17 m with 680 m basin width and direct Gulf of Suez access, typical vessel range Handysize → Capesize → ULCV, multi-purpose deep-water — container, bulk, ro-ro, oil + lng.
What cargo can be loaded at Ain Sokhna Port?
Best suited for Salt (Siwa / Qattara rock salt + chemical-grade), Red Sea sea salt (Ain Sokhna saltworks), Cement + clinker, Fertilizers (urea, DAP), Gypsum + plaster, minerals, Phosphate rock and 2 more. Less suitable: Sea salt (North Sinai / Bardawil source) — the commodities table on this page gives the reason for each.
What laycan and loading terms apply at Ain Sokhna Port?
Bulk loading rate: 10,000–15,000 MT/day on dedicated bulk berths; 12,000 MT/day in the group port-loading register. NOR on arrival; SOF signed by Master, agent and EGG; 10,000–15,000 MT/day on dedicated bulk berths; Time Sheet basis for laytime.
How is cargo verified at Ain Sokhna Port before the Bill of Lading?
Composite sample per ISO / ASTM sampling plan; CoA / MTC issued before NOR acceptance and B/L; out-of-spec lot rejected, never re-graded or renegotiated. Independent inspection: Hold inspection, sampling during loading, draft survey, witness test; SABER, KEBS PVoC, BIS, GACC programmes where required.
What paperwork ships with cargo from Ain Sokhna Port?
Mate's Receipt + B/L; Certificate of Origin (PAFTA preferential for Arab destinations, EUR.1 for EU rotations); CoA / MTC; PSI certificate; Red Sea-specific maritime safety documentation; GOEIC clearance.

Other questions? Email our export desk — the export desk replies to every request.